Inventory
To Install Domestic Air Conditioner Unit For (One Room 2.5 kw) maximum 15 meter pipe run
Call Out To Standard Cylinder with a leak , drain water from cylinder cap off pipe,s disconnect power
To Install Single Two Port Valve Actuators
Install Correct Circuit Breaker Shower
Earth Gas Pipe
To Adjust Wall Mixer Valve
Assumptions are that there are appropriate means to isolate the hot and cold water supplies . If unsatisfactory means to isolate and extra charge will apply minimum £58 + vat to be billed extra .
To remove old bathroom cabinet and fit toilet seat
Install 20 amp circuit breaker for kitchen sockets + breaker
To Change radiator pipe work re plumbing changes for two radiators
Emergencey Call Out on 14/1/24
Service Mini Split Inside and Out side unit.
Site Visit 13 March with new pump / unable to fit Technical Issue
Card Charges
To , Install Switch for outside light /drill hole through wall and connect
1,To Install New Domestic Fuseboard 18 Edition With RCBO,S and SPD
Electrical Work Excluding parts
Call Out To Unvented Cylinder with a leak , drain water from cylinder cap off pipe,s disconnect power
Install two ceiling lights
To re gas + pressure test +HVAC outside unit that’s had leak or low on gas HFCs
To Install Safety Relief Valve
To Investigate Why Immersion Heater Not Woking (Gone To Over Heat Reset)15/12/2023
Install two 22 mm valves hot to cylinder / tank feed cold
To Install New Waste Bathroom basin
To investigate fault / and fit new valve
To remove small section gas pipe in wall and blank off
To Fit New Parts To Toilet Cistern And Test Discovered Crack In Outer Case 15/12/2023
Electrical Inspection Test 2/3 Bedroom House EICR
Electrical Inspection Test 5 Bedroom House EICR
Small Shop Electrical Test EICR
Electrical Inspection 4 Bedroom House EICR
Electrical Inspection Test 1 & 2 Bedroom Flat EICR
4b-Install Power Point For Stair Lift
4a-To disconnect and make safe old redundant domestic alarm internal External Boxes
Investigate Problem With datalogger / Or other fault /
2-Install Cat6 Data Point
4-To Remove Old Light Fittings (make safe with connectors block)
3-Install replacement Standard light Switch
To Install Solar PV,s System A Including Fitting (Hybrid System).
To Install Solar PV,s System B Including Fitting (Hybrid Type )
Service Check On Solar (Hybrid System).
5-Install extra tv point
5B Investigate an electrical faults on solar P V system
5a-Change Spur Unit To Double Socket Surfaces Mounted
5b-Install 13 Amp Spur from a local (existing adjacent point only).
5C-Investigate an electrical underfloor heating system faults
7a-Investigate / testing on immersion heater(s) faults .
6-Install Replacment Electric Socket Fronts
7-To Install Replacement Ceiling Smoke Alarm Units (Like for Like) wired type
8-To Replace Faulty Light pull Switch
9-Install New/Part Circuit For Outside Light
10A-Install A Replacment Security Light at Front door
10-Install A Replacment Security Light (like for like) Maximum Height 4 meters
11-To install electrical point for tail rail / heater bathroom
12A To Wire Some Basic Lights /Sockets in Garage Shed Summer House.
12-Install A New Supply Garage Shed Summer House
13-Install A New Loft Light
14-Install New 13 Amp Double Socket (Surface Installation Only).
15-Install New Dimmer Switch (like for like).
16-Down Lights Installation or Replacements. Add Qty's and (New installation supplement )as required
17-To Investigate Electrical Lights Faults
18A To Investigate electrical fault Garage Supply
18-To Investigate electrical Socket Faults
Drain Full Heating System And Make Safe for Empty House @
Standard Direct Indirect Investigate Leak
1-Minor Repair Toilet Cistern
Investigate problem with underfloor heating @
To replace 2G S00916 Shower-front Panel/ Rear Control Box @
19-Install An Outdoor Power Socket 13 Amp (maximum length five meters length)
Investigate Water Hammer On Hot / Cold Supply Pipes @
To re fix a loose standard toilet pan to floor
To replace leaking hose’s on bath/ basin @
1-Boiler Service Wall Mounted Natural Gas (Standard )
1-To Install A Replacment Electric Shower ( like for like) @
1A, Investigate poor water flow hot/cold taps @
To Replace Broken Waste Pipes External Wall. (Not Stench Pipe) @
2 -Major Repair Toilet Cistern
2A , Install A Inline Electrolylic Scale Inhibitor @
To Install Replacement Service Valves Hot Cold supply’s to Power Shower @
To replace existing bath panels ( like for like ) plastic type @
2-Investigate Fault On Electric Shower @
3-Install a like for like BIV mixer valve shower @
3- Install Replacement Stop Cock Valve (or additional valve) @
2-Service A Radiant Gas Fire Natural Gas
3-Wall Mounted Gas Boiler (Major ) Service
5-Service A Storage Combination boiler With Unvented cylinder
4-Service Floor Mounted Open Flue Gas Boiler NG
4-Install Replacment Kitchen Tap @
5- Install Replacment Bath Taps Or Thermostatic Tap
6-Natural Gas Back Boiler - Gas Fire Service
5 A To Install Replacement Concealed Cistern @
6- Leaking Tap / Repair.@
7-Service wall mounted gas water heater
7- Install Outside / Inside : Tap
8 -Install Replacment Pair Basin Taps (Mono or Single). @
8-Gas Water Heater Landlord Check CP12
9-Gas Hob Landlord Certificate CP12
10-Gas Cooker Check CP12 Standard 600mm Cooker
10-Gas Cooker Check CP12 Standard 600mm Cooker
11-Gas Boiler Service With Landlord Cert CP12 (one item)
12-Gas Boiler Landlord Certificate CP12 ( Not A Service ) NG
20-Install A ( Like For Like ) immersion Heater Thermostat
21-Install Replacement Immersion Heater
1-Service A Storage Heater
13-To carry out Gas Testing investigate Gas Leak
14-To disconnect a cooker
To modify gas pipe in sub floor making pipe work flush with floor level
2-Investigate Fault On Storage Heater
15-To disconnect gas fire and test
3-To Assemble And Install Storage Heater Fit To Wall ( like for like ).
7-To install Convector Heater (Like for Like) to existing electrical supply.
4-To Install A New Circuit For A Storage Heater 3.2kw
16-To Disconnect gas hob and test
17-Comprehensive Heating System Check.
5-To disconnect and remove storage heaters
22-Install electric Hob
23-To Connect Single Free Standing Cooker
24-To Connect a ( like for Like ) 600mm Built In Fan Oven
25-Move Cooker Point Away From Heat Zone
26-Install New Circuit For A Cooker 30 Amp Rated (10 meter max run )
9 -Plumb In Washing Dishwasher Machine Full Installation @
10- Disconnect Dishwasher Washing Machine ( for Moving House ) @
11- To Connect Washing Machine/ Dishwasher To Exsiting Services @
18-Service Natural Gas DFE Gas Fire
Investigate Problem With Electric Shower Circuit @
4-Install New Circuit For An Electric Shower 8.5 kW (and shower ) @
27-To Install Two Way Distribution Board For Garage Or Shower
28-Portable Appliance Testing ( per unit )
29-To Install Replacment Ceiling Rose or Batton Holder
12-Broken flush handle replacment standard toilet @
Emergency Plumbing Gas Electrical Outside Peterborough within 25mile radius 60 Minutes Slot
13 -To install a replacement toilet seat @
Emergency Plumbing Gas Electrical Outside Peterborough within 25mile radius Only 30 Minutes Slot
To Install New Domestic Central Heating Pump @
30-Install Replacement Light Fitting
Emergency Plumbing Gas Electrical Peterborough Only 30 Minutes Slot
30a-Install Replacement Strip Light Garage / Kitchen
14- To replace plastic toilet cistern like for like @
To Investigate Faults On Gas Boiler ( None Emergencey)
To Investigate Why No Hot Water ( None Emergencey) @
3-To install a new domestic electric boiler (Boiler Only).
Replace 48 Gallon Header Tank
30-To Install Free Standing Gas Cooker 600 mm Installation (natural gas )
29-To Install (like for Like) Gas Hob
To Disconnect and remove old electric hob
Extra Radiators to Clean Add On,s
To Install Seven Standard Raditors ADD ON ( labour Only)
27A -Service Balance Flue Gas Fire natural gas
6-Convert Storage Point To 24 Hr Supply
Installation Surface Mixer Valve With Alteration of Pre Exsiting BIV Valve Disconnection. @
11-Install complete new power shower @
Clean And Disinfect Heating Header Tank Fit New Ball Valve @
16-To Fit New Shower Rail @
To Install New Expansion Vessel To Heating System @
To Investigate Faults On A Standard Oil Boiler ( None Emergency)
27-Service LFE Gas Fire natural gas
Install 100cm Ventilation Vent For Gas Appliance
21-Install Balance Flue Gas Fire
1 Hr Time Slot
1/2 Hr Time Slot
36-To Install A Replacment Maserator ( like for Like ). @
19-Install Older Type (pan with flush pipe )Replacement Toilet and Cistern (like for like) @
23-Investigate minor leak bathroom basin @
15-Install Under Kitchen Water Softener
Central Heating Flush 10-12 Radiators (£30 Extra Further Radiators to be added separately by engineer
Emergency Plumbing Gas Electrical (Peterborough). 60 Minutes Slot
40-To Install (like for like) Immersion Heater Timer
32-Install Electric Vehicle Charge Point (up to six meters ) 7KW System.
36-Lighting Control Installation ( two flood lights / four PIR Sensors )
30-Replace Broken Waste Fitting Basin @
Service Direct Unvented Water Tank
19-Gas Cooker /Hob Minor Pipe Work Changes. (Click the + Button Add To The Order ).
16-Install Cold Water Mains Booster Pump @
37-Relocate Existing 13 amp Socket (up to two meters ) Surface Fit/ Dry Wall Only
34-Install Replacment bathroom blow heater
Investigate Faults On Heating Controls/system @
14-To Install Two Bottle Regulator LPG
To Install Colt Hight Top Bird Guard to chimney pot @
35-Install Under Cupboard Kitchen Light
26-Investigate internal Leak/blockage ( bath /sink /washing machine /Shower/basin/radiators @
Milage Charge Outbound 30 And Return To Peterborough 30 Miles
7-Re grout tiles around bath /shower (per meter )
1-Investigate problems with electric boiler
26B Investigate only under floor / Wall inside internal leak cold / hot water supply
4-Install New Extractor Fan To Out Side Wall Or Ceiling or Roof Terminal
38-To Install Cold Water Supply To Large Fridge @
23-Install New Pipe Line To An Appliance ( Up To 8 Meters )
41-To Install A New Supply For Hot Tub or Green House
To Install New Pressure Vessel for Unvented Cylinder
Slim Jim 12 kw Electric Boiler
44-To Install Earthing To Gas or Water Services (per meter)
1.5 Hr Time Slot
5-Full Installation Surface Mixer Valve @
35-To Install (like for like) Stench Pipe System 110mm @ Please Read Notes
31-To Install Radiant Gas Fire
6-LPG Range Cooker Installation Duel Gas Range Type Cooker Electrical connection included
19-To Install New Cartridge to Surface wall mouted mixer valve @
To Install Mid Position Valve 22mm
Oil Boiler Service
3-Fit a mirror blind or shelf
42-To Install Standard Kitchen Sink (like for Like ) @
5-Fit shower curtain rail straight type only
Visual Check Electrical Installation (typical 3 bed House Only) -no testing-
Milage Charge Outbound 45 And Return To Peterborough 45 Miles
24-Install flueless gas fire
Install Condensate pipe work , for gas boiler @
22-Install DFE Gas Fire.
1-Fix Minor Leak on radiator @
1-Install Replament 4 Inch Extractor Fan ( like for like ) .
20-Install built in gas cooker (like for like ) to existing services only.
nstall Replacment Header TanK Ball Valve +Float @
Clean Central Heating Filter @
34-To Install (like for like ) Bathroom Suite @
7-To Install Roof Inline Fan
Milage Charge Outbound 16 And Return To Peterborough 16 Miles
7A- Re Install Raditor After Decorating
6-Install Wiring for Extractor fan
22-Investigate minor leak on bath Waste @
Deva kitchen Tap
Site Assessment, technical help, Consultation Pboro.
Checks Made -Burner Pressure -Meter-Pipe Work-Ventilation Burner Parts Electrodes .
8-To fit Small TV Bracket
Milage Charge Outbound 8 And Return To Peterborough 8 Miles
1-Convert Natural Gas Cooker To LPG , i.e. fit jets
Site Assessment, technical help, Consultation outside peterborogh
Kit D . Waste Fittings New Sink
3 Hr time slot
12-To Carry Out Gas Pipe Work Modification For Cooker Point LPG
Basic Electrical Installation Test On Effected Circuits after water damage from leak
To Repair Wall
Unvented Hot Water Cylinder 300ltr Indirect
Dishwasher /washing machine extra cost for pipes or drain /parts to be billed as used .
45-To re seal around bath area/ shower screen @
23-Investigate minor leak on kitchen sink/Washing Machine Pipe Work @
To Install Domestic Air Conditioner Unit For (Three Rooms ) 2.5 Kw, +3.5KW Indoor 8.0 kw Outdoor Unit
3/4 Hr Time Slot
Viessmann 100 W 26Kw Open Vent Boiler
25-Power Max Natural Gas Boiler Service
To Install A Replacment Pressure Valve Single 6bar-
1-Drill fix and items to walls (per item ) please add Qty
Roy Darlow Estimate for installing radiator
19-Install Toilet Pan Connector -like for like /Fix leak on rear toilet
Free Estimate Local To Peterborough Only
To Install Single Port Valve 22mm
29-Repair standard outside tap @
7-Install Like For Like Power Shower @
9-To relocate a radiator within 500 mm same location @
Install new section cable for shower switch to new shower inc cable
28-To Carry Out Gas Pipe Work Modification For Cooker Point
Replacement radiator (like for like )
To Install Domestic Air Conditioner Unit For (Two Rooms ) 2.5 KW , Indoor 5.0 kw Outdoor
To Install A Replacment Mono Block PRV With None Return Valve And Strainer
9..To Install 4” Over bath Ceiling fan to outside wall or soffit Please Select Options
14 B- Investigate Faults On Hot Water System Cylinder @
28-Repair minor leak from Washing Machine Cold or Hot Feed @
Replace 10 Gallon Header Tank @
21-Install Vanity Unit @
31-Replace waste outlet connector rear of toilet pan @
39-Relocate Wall Switch (Two Meters ) to Dry wall only .
Install Like for Like Remote RF Thermostat @
8-To fit Large TV Bracket
43-To Install Ceiling Fan Light
Install pop up waste on basin
Investigate Faults On Unvented Hot Water System
Quartz+Bath+Filler+Tap
2 -To Wire S or Y Plan Heating Controls @
5-Investigate Gas Leak On LPG system
4-Install New Wall Thermostat Standard @
46-To replace broken shower trap ( like for like ) @
6-To Install Large Columm Radiator. (Note Only To Solid Walls) @
1-Install Smart Thermostat Hive Active @
39-To Install New Bidet Tap @
2- Install Standard Small Towel Radiator @
24- Assemble and install shower screen two sides and door or quad unit @
2-Install 1200mm Cooker Extractor Hood
31-Convert Single 13 Amp Socket To A Double
Customer Warranty Call Back
13-To Install Single LPG Regulator
Service unvented under sink hot water system
32-To Install range cooker with electrical connection to (existing services).only
Lift Up Lever Taps Chrome
Unvented Hot Water Hester 2 Kw
11-To Install Thermostaic Radiator Valves @
2-Install Four Bottle LPG Regulator
3-Install LPG pipe work for cooker /external up to five meters /
2-Service An Electric Boiler
Victoria Basin Taps Chrome
Milage Charge Outbound 20 miles Back 20 miles
5-Install Replacment 6 Inch Extractor Fan ( like for Like )
2-Fit A Standard Shower Screen Over Bath
9-Service DFE Gas Fire LPG
To Install new unvented hot water cylinder
15-To Service Water Heater LPG
33-To remove gas fire and test flue on a standard Chimney.
Customer Continuation
38-Relocate TV Socket ( two meters new location ) Surface /Dry Wall Only
20-To Install new circuit for 7.5 / 8.5 kw electric shower (10-18meters) @
17-To Install A (like for like ) Wall Mixer Valve Only
4-Radiator Problems ( balance and adjustments up to 8 units ) @
To Clean And Repair Mono Block PRV With None Return Valve And Strainer
3-Install A like for like Boiler Timer Two Chanel Type Hot Water Heating @
To drain unvented cylinder and install one or more Immersion heaters
42-To Install Battery Type Smoke Or Co Alarm to Ceiling
7-Replace remote 2nd stage regulator lpg like for like
To Investigate problem with Ignition on LPG Gas Cooker
3-Install 600/900 mm Extractor Hood add drill hole for external vent .
8-Safety Check On LFE/DFE Gas Fire LPG not a service
5-Repair Leaking Radiator Valve/pipe/work @
2 Hr Time Slot
40-To Install Over Sink Drinking Water Filter Tap @
37-To Install Basin and or Pedestal (like for like ) replacement @
31-Replace Mono or Mixer Tap Basin @
46-To Install Ring Door Bell
44-To install Bidet Hand Held Shower Head Toilet Spray Shower Rinse Hygiene @
27-Repair 110mm Stack Pipe ( Internal House ). @
33-Install Replacement Bathroom Light That’s IP 44 Rated
43-To Repair /replace /Standard Bath Waste System @
19-Install (Modern )Replacement Toilet and Cistern (like for like) @
10-To remove radiators for Decorating @
41-To Install Small Cloak Room Basin (like for like ) @
30a Replace Waste Trap On Basin
20-To Install Standard Indirect Open Vent Cylinder 1050-450 mm like for like @
48-Install shaver point (like for like ) to Existing supply
To install Combination Boiler Replacment or (like for like ) (Select Boiler Required)
To Install Open Vent Boiler with standard flue
15-To Install Shower or Domestic Booster Pump ( Like For Like )( Or New) —Dont forget add pipe install .
To Install new pressure vessel to combination boiler @
To Disconnect /remove toilet and refit to accommodate new stench pipe
18-Install Remote Filling Loop @
To Install RF Room Thermostat Wire Into Boiler Systems @
6-Hang A Picture
25-Install A Standard Shower Tray And Screen @
Central Heating Inspection @
7-To Install New Radiator To New Location @
3-Install Replacement Radiator (like for Like ) @
To Install Permanent Live to an exsiting system to boiler @
10-To Connect LPG or Natural Gas Services To RPH ( Maximum Three Meters )
To remove disc from gas meter purge gas , through meter and pipe work, reconnect gas cooker , carry out soundness
20a-To Install Standard Direct Cylinder 1500-450 (like for Like). @
11-Service Wall Mounted LPG Gas Boiler
4-Fit bathroom accessories (per item) please add Qty
26-Replacement Meter Box Door
45-To Install New Circuit 16 Amp (maximum 18 Meters)
12-Investigate Faulty Mixer Valve @
33-To Install (Like for Like ) Standard Bath @
To Install Unvented Under cupboard Electrical Water Heater (Like for like )
8-To Change Radiator Pipe Work (excluding parts).@
47-To Install Single Hot Water Pump On -Open Vent Cylinder @
Replace 25 Gallon Header Tank @
10-Install Replacment Mira Exel Mixer Valve (like for like ) @
14-Replace Broken Shower Pull Switch @
32-Sure Stop Installation @
To Install A Replacment T+P Valve
Service Unvented Hot Water Cylinder
LPG Range gas cooker check Cp12
17-To Install A (like for like ) Wall Mixer Valve @ Riser Rail / Shower Head
13-Investigate problems with power shower unit @
8-Install Mira Over Heat Cut Out @
4-Install Standard 600mm free Standing LPG Gas Cooker