
X➡️ ELECTRICAL WORKS
ELECTRICAL WORK


2-Install Cat6 Data Point

4b-Install Power Point For Stair Lift

3-Install replacement Standard light Switch

4-To Remove Old Light Fittings (make safe with connectors block)

4a-To disconnect and make safe old redundant domestic alarm internal External Boxes

5-Install extra tv point

5B Investigate an electrical faults on solar P V system

5a-Change Spur Unit To Double Socket Surfaces Mounted

5C-Investigate an electrical underfloor heating system faults

5b-Install 13 Amp Spur from a local (existing adjacent point only).

7-To Install Replacement Ceiling Smoke Alarm Units (Like for Like) wired type

6-Install Replacment Electric Socket Fronts

7a-Investigate / testing on immersion heater(s) faults .

8-To Replace Faulty Light pull Switch

9-Install New/Part Circuit For Outside Light

10A-Install A Replacment Security Light at Front door

10-Install A Replacment Security Light (like for like) Maximum Height 4 meters

11-To install electrical point for tail rail / heater bathroom

12A To Wire Some Basic Lights /Sockets in Garage Shed Summer House.

12-Install A New Supply Garage Shed Summer House

13-Install A New Loft Light

15-Install New Dimmer Switch (like for like).

14-Install New 13 Amp Double Socket (Surface Installation Only).

16-Down Lights Installation or Replacements. Add Qty's and (New installation supplement )as required

17-To Investigate Electrical Lights Faults

18A To Investigate electrical fault Garage Supply

18-To Investigate electrical Socket Faults

19-Install An Outdoor Power Socket 13 Amp (maximum length five meters length)

20-Install A ( Like For Like ) immersion Heater Thermostat

21-Install Replacement Immersion Heater

22-Install electric Hob

23-To Connect Single Free Standing Cooker

24-To Connect a ( like for Like ) 600mm Built In Fan Oven

25-Move Cooker Point Away From Heat Zone

26-Install New Circuit For A Cooker 30 Amp Rated (10 meter max run )

27-To Install Two Way Distribution Board For Garage Or Shower

29-To Install Replacment Ceiling Rose

28-Portable Appliance Testing ( per unit )

30a-Install Replacement Strip Light Garage / Kitchen

30-Install Replacement Light Fitting

48-Install shaver point (like for like ) to Existing supply

44-To Install Earthing To Gas or Water Services (per meter)

41-To Install A New Supply For Hot Tub or Green House

36-Lighting Control Installation ( two flood lights / four PIR Sensors )

35-Install Under Cupboard Kitchen Light

34-Install Replacment bathroom blow heater

37-Relocate Existing 13 amp Socket (up to two meters ) Surface Fit/ Dry Wall Only

33-Install Replacement Bathroom Light That’s IP 44 Rated

39-Relocate Wall Switch (Two Meters ) to Dry wall only .

45-To Install New Circuit 16 Amp (maximum 18 Meters)

31-Convert Single 13 Amp Socket To A Double

47-To Install Waterproof Type 13 Amp Socket Under Sink

43-To Install Ceiling Fan Light

42-To Install Battery Type Smoke Or Co Alarm to Ceiling

38-Relocate TV Socket ( two meters new location ) Surface /Dry Wall Only

32-Install Electric Vehicle Charge Point (up to six meters ) 7KW System.

46-To Install Ring Door Bell
