X➡️ ELECTRICAL WORKS
ELECTRICAL WORK
4b-Install Power Point For Stair Lift
4-To Remove Old Light Fittings (make safe with connectors block)
3-Install replacement Standard light Switch
4a-To disconnect and make safe old redundant domestic alarm internal External Boxes
2-Install Cat6 Data Point
5a-Change Spur Unit To Double Socket Surfaces Mounted
5B Investigate an electrical faults on solar P V system
5-Install extra tv point
5C-Investigate an electrical underfloor heating system faults
5b-Install 13 Amp Spur from a local (existing adjacent point only).
7-To Install Replacement Ceiling Smoke Alarm Units (Like for Like) wired type
6-Install Replacment Electric Socket Fronts
7a-Investigate / testing on immersion heater(s) faults .
8-To Replace Faulty Light pull Switch
9-Install New/Part Circuit For Outside Light
10-Install A Replacment Security Light (like for like) Maximum Height 4 meters
10A-Install A Replacment Security Light at Front door
11-To install electrical point for tail rail / heater bathroom
12-Install A New Supply Garage Shed Summer House
12A To Wire Some Basic Lights /Sockets in Garage Shed Summer House.
13-Install A New Loft Light
15-Install New Dimmer Switch (like for like).
14-Install New 13 Amp Double Socket (Surface Installation Only).
16-Down Lights Installation or Replacements. Add Qty's and (New installation supplement )as required
17-To Investigate Electrical Lights Faults
18-To Investigate electrical Socket Faults
18A To Investigate electrical fault Garage Supply
19-Install An Outdoor Power Socket 13 Amp (maximum length five meters length)
20-Install A ( Like For Like ) immersion Heater Thermostat
21-Install Replacement Immersion Heater
22-Install electric Hob
23-To Connect Single Free Standing Cooker
24-To Connect a ( like for Like ) 600mm Built In Fan Oven
25-Move Cooker Point Away From Heat Zone
26-Install New Circuit For A Cooker 30 Amp Rated (10 meter max run )
27-To Install Two Way Distribution Board For Garage Or Shower
29-To Install Replacment Ceiling Rose or Batton Holder
28-Portable Appliance Testing ( per unit )
30a-Install Replacement Strip Light Garage / Kitchen
30-Install Replacement Light Fitting
39-Relocate Wall Switch (Two Meters ) to Dry wall only .
40-To Install (like for like) Immersion Heater Timer
32-Install Electric Vehicle Charge Point (up to six meters ) 7KW System.
36-Lighting Control Installation ( two flood lights / four PIR Sensors )
44-To Install Earthing To Gas or Water Services (per meter)
41-To Install A New Supply For Hot Tub or Green House
42-To Install Battery Type Smoke Or Co Alarm to Ceiling
35-Install Under Cupboard Kitchen Light
37-Relocate Existing 13 amp Socket (up to two meters ) Surface Fit/ Dry Wall Only
48-Install shaver point (like for like ) to Existing supply
38-Relocate TV Socket ( two meters new location ) Surface /Dry Wall Only
46-To Install Ring Door Bell
45-To Install New Circuit 16 Amp (maximum 18 Meters)
31-Convert Single 13 Amp Socket To A Double
47-To Install Waterproof Type 13 Amp Socket Under Sink
43-To Install Ceiling Fan Light
34-Install Replacment bathroom blow heater